Project Summary
2021
- Greening Euroa - Detailed design for Strathbogie Shire Council
- Engineering Survey set out work to place the footprint of a new house, overlooking Lake Eildon
- Condition Assessment for future development of the Currawa Primary School at Dookie
- Truck Wash Design at Euroa for the Strathbogie Shire Council
- Development works with the Country Fire Authority throughout Victoria
- Development of a Commercial Sub-Division - Bendigo
- Stages 1&2 Development of a Residential Sub-Division - Kialla
- Shed Certifications with a local Shed Builder
- Design Sewer Realignment for rural property Mansfield
- Continuing Work with Councils related to Bridge Surveys and Design
- Continuing Alpine Engineering Design at Mount Buller, Mt Sturgeon and Mt Abrupt
- Engineering and Structural Assessement Reports continue for the Insurance sector
2020
- Bunning Seymour Project Management and Tender Process
- Completed Shed Design, Service Road and Sewer Extension along Doyles Road, Shepparton
- Cobram Visitor Information Centre - Moira Shire Council
- Engineering Design and structural integrity reporting of Mt Buffalo Gorge Lookout
- Engineering Design and structural integrity reporting for Mt Sturgeon Boardwalk and Stairs
- Unmanned Aerial Surveys. Our Drone capabilities have enhanced Project outputs - check out the Drone Footage tab
- Engineering Survey, Civil & Structural design solutions throughout the region
- Continuing Engineering and Survey work with Local Councils throughout Victoria from Shepparton, Echuca, Cobram, Albury/Wodonga and Wangaratta right across to Colac
- Alpine Engineering Design in partnership with Landscape Designers and Local Builders
2019
- Moira Shire projects - Cobram Visitor Information Centre; Numurkah Indoor and Outdoor Pools; Numurkah and Nathalia Netball Courts
- Mitchell Shire projects - Trestle Bridge Over Mollison's Creek, Pyalong; Seymour Heritage Bridge in stages
- Engineering Survey, Civil & Structural design solutions throughout the region
- Unmanned Aerial Surveys. We now have three drones with varying capabilities and five CASA icenced pilots
- Commenced Project Management - Doyles Road Service Road design and construction
- Investigation reports to assist with Planning Permits
- Continuing Engineering and Survey work in the Alpine regions of Buller and Mt Buffalo
- Dilapidation survey and reports for Edward River (NSW) and Campaspe (VIC) Councils
- Continuing our association with Insurance Companies, providing Insurance Risk Assessments etc.
2018
- Design of Car Parks, Kerb & Channel and associated drainage in Wangaratta
- Structural assessments of historical assets
- Design and Project management of boat ramps and carpark
- Concept designs for entrances into land owned by Traditional Owners
- Civil and Structural Engineering sesign of a works depot
- Dam decommissioning Engeering report
- Investigation reports for land development, drainage, service upgrades for planning permits
2017
- Engineering Services - Barmah Punt Project
- Project Management - Winton Wetlands Indigeonous Trail
- Warehouse extension Planning Submission
- Structural Engineering and Project Management in conjunction with various Councils; drainage, rural road surfacing and special projects etc.
2016
- Detailed Design and Development of Greater Shepparton Regional Sports Precinct:
East-West Boulevard & Packham Street Extension
- Snobs Creek Native Fish Hatchery - Stage 2
- Kirwans Bridge strengthening work
- Survey and design of the North East Rail Trails for Regional Development Victoria encompassing the trail sections:
Beechworth to Yackandandah
Yackandandah to Huon
Wodonga CBD Link
Winton Wetlands to Wangaratta Link
- Survey and design of the Goulburn Valley Rail Trail Link to Eildon for the Murrindindi Shire Council to include the sections:
- Alexander to Thornton
Thorton to Eildon.
2015
- Detailed Design and Development of Greater Shepparton Regional Sports Precinct:
Netball Courts Extension
Athletic Track Re-development
- Transfer station upgrades at Euroa, Nagambie and Avenel for the Strathbogie Shire Council.
- Wallaby Lodge extension at Mt. Buller.
- Nagambie foreshore works for the Strathbogie Shire Council.
- Streetscape works for Anstruther and Nish Streets, Echuca.
2014
- Detailed Design and Development of Greater Shepparton Regional Sports Precinct:
Commumity Footaball Complex
Multi-purpose Synthetic Sports Field
Hockey Field Extension
- Development and design for an access road for the proposed Whitehorse Village complex at Mt. Buller.
- Binney Street roundabout design for Strathbogie Shire Council.
- Shepparton Showgrounds Arena Development and Drainage.
- Wentworth Shire Council Drainage Investigation.
2013
- Nagambie roundabout design for Strathbogie Shire Council.
- Murangal Bend Retaining Wall on the Campaspe River in Echuca for the Shire of Campaspe.
- Bridge replacements at Creighton Creek and Miepoll South for Strathbogie Shire Council.
2012
- Engineering designs for Echuca Rail Station and Wandong Rail Station car parks, bus interchanges and stops in various locations within Victoria for the Department of Transport.
- Castle Creek Levee Management Plan for the Shire of Strathbogie.
- Kerb and channel design for Mitchell Shire Council.
- Building structural assessment for lease application in the Alpine region.
- Project Management of the Kooweerup Rail Trail.
- Survey for the widening of Sugarloaf Creek Road for the Mitchell Shire Council.
- Specialist advice, inspections and assessments for various loss adjusters and insurance companies.
- Oval lighting engineering design for the Doug Lindsay Reserve, Creswick for Hepburn Shire Council.
2011
- Develop concept designs for the demolition of Kirwans Bridge and construction of a new bridge for the Shire of Strathbogie in conjunction with Heritage Victoria.
- Design and documentation of a boat ramp, boardwalk, jetty and the stabilisation of river bank at Bundalong for Moira Shire Council.
- Conduct Civil and Structural Surveys along with Service Investigations of the existing Warragul Rail Station, and develop an Options Study for the Department of Transport in conjunction with Heritage Victoria.
- Survey and develop a water management strategy of Castle Creek in Euroa for the Shire of Strathbogie.
- Alpine Region flood damage assessment, reporting, rectification works design and documentation for Department of Sustainability & Environment.
- Project management for intersection signalisation for Department of Transport at Watson St & Windham St in Wallan.
- Providing ongoing technical support for LP Gas reticulation - Buller Gas and Indigo Shire.
- Assessment, structural design and documentation of timber footbridges & boardwalks at Mathoura for the Murray Shire Council.
- Design and documentation for Kofler’s Depot, restaurant and apartment development at Mt. Buller.
2010
- Survey, design and tender documentation for intersection signalisation for Department of Transport at Watson St & Windham St in Wallan (2010-11).
- Survey, design and tender documentation also project management for bus terminal & staff car park for Department of Transport at Parkdale Secondary College in Parkdale (2010-11).
- Survey, design and documentation of the Goulburn River High Country Rail Trail in conjunction with Mansfield, Mitchell and Murrindindi Shire Councils.
- Survey, design and documentation of the recreation reserves, buildings & foreshore facilities at Nagambie, including Jacobson’s Lookout for the Shire of Strathbogie.
- Specialist advice, inspections and assessments for various loss adjusters and insurance companies.
2009
- Survey & design of 4.5km of Stockdales Road at Darra Weit Guim, Mitchell Shire Council (2009-10).
- Design and documentation of Euroa Municipal Library for Strathbogie Shire Council.
- Design and documentation of replacement workshop and staff accommodation at Lake Mountain after bushfires for Alpine Resort Management Board.
- Design and documentation of landfill development & management plan for Deniliquin Council.
- Rail trail feasibility and development cost investigations for South Gippsland Rail Trail, from Cranbourne to Nyora, for Department of Transport (2009-10).
- Specialist advice, inspections and assessments for various loss adjusters and insurance companies.
2008
- Rail trail feasibility and development cost investigations for Goulburn River High Country Rail Trail for Mitchell Shire Council (2008-09).
- Civil design for the Doug Lindsay Park Recreation Reserve at Creswick, including oval lighting design (2008-2011).
2007
- Strategic plan – Infrastructure for Golden Plains Shire.
- Design and documentation for 2 x road bridges for Parks Victoria at Cudgewa.
- Design and documentation for a road bridge for Parks Victoria at Barmah.
- Structural design and documentation for Herringbone Lodge & Slalom Lodge at Mt. Buller, for McIntyre Partners Architects and Humphries & Cooke Builders (2007-08).
- Infrastructure service solutions for Mt. Baw Baw residential development for the Mt. Baw Baw RMB (2007-08).
- Engineering design and documentation for planning approval for multi unit residential development at Pinnacle Valley by Accor (2007-08).
- Planning and engineering for commercial subdivision (30 lots) at Yarrawonga, for Condaw Property Developments (2005-08).
- Planning approval and engineering (structural works) for the Abom 6 seater chairlift at Mt. Buller for Buller Ski Lifts (2007-08).
- Planning/building approval and architectural/civil & structural design for Arlberg Hotel Apartments at Mt. Buller and underground car park (2006-08).
- Engineering design and documentation for Mirrabooka (48 lots, stage 1 & 2) residential subdivision at Mallacoota for Infrastructure Services (2007-08).
2006
- As constructed GPS survey of snow making infrastructure, for Mt .Buller Ski Lifts.
- GPS survey of sediment control measures, for Mt. Buller Ski Lifts.
- Planning approval & engineering design for Horsehill car park extensions, for the Mt. Buller Resort Management Board.
- Engineering survey & design for the Water Reuse Pipeline (Snowmaking) project, for the Mt. Buller Resort Management Board.
- Deep Creek Marina Moorings, structural review and refurbishment and civil works including access road, car park and associated drainage for Dynamic Properties Pty Ltd.
- Infrastructure study for intensive agriculture at Golden Plains Shire (2006-07).
- Engineering design and documentation for a 28 lot residential subdivision at Mathoura for Murray Shire Council (2006-07).
2005
- Project management for Mirimbah Bridge for Mt. Buller RMB.
- Alignment survey & setout for Northside Chairlift, for Mt. Buller Ski Lifts.
- Planning/building approval and architectural/civil & structural design for the Nagambie Lakeside Apartments.
- Perisher Range Resorts LP Gas reticulation feasibility study, concept design and stage 1 pipeline works, for National Parks & Wildlife Service NSW.
- Structural design and documentation for Buffalo Lodge & Razorback Lodge at Mt. Buller, for Groset Pty Ltd.
- Planning and engineering for Wheller Road residential subdivision (18 lots) in Shepparton, also the Future Metals industrial subdivision (16 lots), Old Dookie Road Shepparton (2005-11).